Technip and FMC Technologies Receive EPCI Award for Statoil's Trestakk Development
                     
                    
                        November 04, 2016
                    
                    
                        
                                
                            
        HOUSTON and PARIS, Nov. 4, 2016 /PRNewswire/ -- The FMC Technologies and Technip alliance has received an integrated engineering, procurement, construction and installation (EPCI) contract from Statoil for its Trestakk field in the Norwegian Sea. The contract was won based on an optimized subsea field layout, accomplished through close collaboration with Statoil during a FEED study performed by FMC Technologies' and Technip's joint venture Forsys Subsea.
    /media/5lanmlsu/release53b1f0df-27b2-4750-ae50-7a03b53ef25c_2229298-id7.pdf
    False
    False